Skip to main content
Photo by George Demeter

Building & Inspection Department Checklist for Permit Applications

Electrical Permit's

Solar Panels

  • Site Plan
  • Plans
  • Ground Mounted – Zoning Permit
  • Plus, Building Permit with Structural Letter - 150 MPH Wind
  • Solar Panel Inspection Options
  • Copy of Contract with Homeowner

Generator

  • Site Plan
  • Load Calculations

*****************************

Building Permit's

Accessory Use

  • Zoning Permit
  • Site- Built Storage Building Drawing with dimensions and building materials
  • Pre-Built Storage Building – Wind Verification – 150 MPH
  • Pools - Specification Information - Height, material. 
  • Decks - Specifications with materials