Building & Inspection Department Checklist for Permit Applications
Electrical Permits
Solar Panels
- Site Plan
- Plans
- Ground Mounted – Zoning Permit
- Plus, Building Permit with Structural Letter - 150 MPH Wind
- Solar Panel Inspection Options
- Copy of Contract with Homeowner
Generator
- Site Plan
- Load Calculations
Building Permits
Accessory Use
- Zoning Permit
- Site- Built Storage Building Drawing with dimensions and building materials
- Pre-Built Storage Building – Wind Verification – 150 MPH
- Pools - Specification Information - Height, material.